Picture 1 of 1
Picture 1 of 1
Shutter Release Extension Cable to fit Canon RS-60E3 Remote. 2 metres long lead.
£6.49
Condition:
More than 10 available / 480 sold
Postage:
Located in: Lake District, United Kingdom
Delivery:
Dispatched within 1 day
Estimated between Mon, 13 May and Mon, 20 May to 43230
Returns:
Payments:
Get more time to pay. See payment informationfor PayPal Credit - opens in a new window or tab
Shop with confidence
Seller assumes all responsibility for this listing.
eBay item number:380892304218
Item specifics
- Condition
- Compatible Brand
- For Canon
- Connectivity
- Cable
- Type
- Shutter Release Extension
- Compatible Model
- RS-60E3
- MPN
- RS-60E3 extension
- Dimensions
- 2m long
- EAN
- Does Not Apply
- Brand
- Pixel Peeper
- Manufacturer Warranty
- 1 year
Item description from the seller
Business seller information
Jack The Hat Photographic Ltd
The Settlement
High Street
Maryport
Cumbria
CA15 6BQ
United Kingdom
Value added tax number:
- GB 942582901
Company registration number:
- 06271283
I certify that all my selling activities will comply with all EU laws and regulations.
Seller assumes all responsibility for this listing.
eBay item number:380892304218
Post to me
Save 50% on P&P for each additional eligible item you buy from *jackthehat*. |
Item location:
Lake District, United Kingdom
Posts to:
Antigua and Barbuda, Aruba, Australia, Austria, Bahamas, Bahrain, Bangladesh, Barbados, Belgium, Belize, Bermuda, Bolivia, Brazil, Brunei Darussalam, Bulgaria, Cambodia, Canada, Cayman Islands, Chile, China, Colombia, Costa Rica, Cyprus, Czech Republic, Denmark, Dominica, Dominican Republic, Ecuador, Egypt, El Salvador, Estonia, Finland, France, French Guiana, Germany, Gibraltar, Greece, Grenada, Guadeloupe, Guatemala, Guernsey, Honduras, Hong Kong, Hungary, Iceland, Indonesia, Ireland, Israel, Italy, Jamaica, Japan, Jersey, Jordan, Kuwait, Latvia, Liechtenstein, Lithuania, Luxembourg, Macau, Malaysia, Maldives, Malta, Martinique, Mexico, Monaco, Montserrat, Netherlands, New Zealand, Nicaragua, Norway, Oman, Pakistan, Panama, Paraguay, Peru, Philippines, Poland, Portugal, Qatar, Republic of Croatia, Reunion, Romania, Saint Kitts-Nevis, Saint Lucia, Saudi Arabia, Singapore, Slovakia, Slovenia, South Africa, South Korea, Spain, Sri Lanka, Sweden, Switzerland, Taiwan, Thailand, Trinidad and Tobago, Turks and Caicos Islands, Ukraine, United Arab Emirates, United Kingdom, United States, Uruguay, Vietnam
Excludes:
Afghanistan, Albania, Algeria, American Samoa, Angola, Anguilla, Argentina, Armenia, Azerbaijan Republic, Belarus, Benin, Bhutan, Bosnia and Herzegovina, Botswana, British Virgin Islands, Burkina Faso, Burundi, Cameroon, Cape Verde Islands, Central African Republic, Chad, Comoros, Cook Islands, Côte d'Ivoire (Ivory Coast), Democratic Republic of the Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Fiji, French Polynesia, Gabon Republic, Gambia, Georgia, Ghana, Guam, Guinea, Guinea-Bissau, Guyana, Haiti, India, Iraq, Kazakhstan, Kenya, Kiribati, Kyrgyzstan, Laos, Lebanon, Lesotho, Liberia, Libya, Macedonia, Madagascar, Malawi, Mali, Marshall Islands, Mauritania, Mauritius, Mayotte, Micronesia, Moldova, Mongolia, Montenegro, Morocco, Mozambique, Namibia, Nauru, Nepal, Netherlands Antilles, New Caledonia, Niger, Nigeria, Niue, Palau, Papua New Guinea, Puerto Rico, Republic of the Congo, Russian Federation, Rwanda, Saint Helena, Saint Pierre and Miquelon, Saint Vincent and the Grenadines, Senegal, Serbia, Seychelles, Sierra Leone, Solomon Islands, Somalia, Suriname, Swaziland, Tajikistan, Tanzania, Togo, Tonga, Tunisia, Turkey, Turkmenistan, Tuvalu, Uganda, Uzbekistan, Vanuatu, Venezuela, Virgin Islands (U.S.), Wallis and Futuna, Western Sahara, Western Samoa, Yemen, Zambia, Zimbabwe
Postage and packaging | Each additional item | To | Service | Delivery*See Delivery notes |
---|---|---|---|---|
£8.99 | £0.61 | United States | Royal Mail International Tracked | Estimated between Mon, 13 May and Mon, 20 May to 43230 |
Taxes |
---|
Price displayed includes VAT. The final charge may be different depending on the delivery address. Learn moreLearn more about value-added tax. |
Returns policy
After receiving the item, cancel the purchase within | Return postage |
---|---|
30 days | Buyer pays for return postage |
Refer to eBay return policyopens in a new tab or window for more details. You're covered by the eBay Money Back Guaranteeopens in a new tab or window if you receive an item that is not as described in the listing.
The buyer is responsible for return postage costs.
Return policy details |
---|
Returns accepted |
Most purchases from business sellers are protected by the Consumer Contract Regulations 2013 which give you the right to cancel the purchase within 14 days after the day you receive the item. Find out more about your rights as a buyer and exceptions.
Payment details
Payment methods
Popular categories from this shop
Registered as a business seller
Seller Feedback (88,527)
This item (50)
All items (88,527)
d***e (44)- Feedback left by buyer.
Past month
Verified purchase
Extension cable worked fine with the remote shutter sold by same seller, plug and play and allows you to shoot at a distance from the camera
c***h (1046)- Feedback left by buyer.
Past 6 months
Verified purchase
Item as described and delivered quickly
c***i (458)- Feedback left by buyer.
Past 6 months
Verified purchase
As Described
m***0 (179)- Feedback left by buyer.
Past 6 months
Verified purchase
Once again, Items received speedily, well packed, and exactly as described in the listing. - I've made purchases from Jack The Hat over many years, and will continue to do so. - Competitive pricing, good quality items, and a seller that always delivers. - Highly recommended!
f***a (388)- Feedback left by buyer.
Past 6 months
Verified purchase
Excellent and recommended seller. I purchased the wrong filter size in error but the seller was able to replace with no fuss once I got in touch after the sale had been made. Item as described, excellent communication and posted promptly. Thanks.
-***n (96)- Feedback left by buyer.
Past 6 months
Verified purchase
Item was lost by Post Office. Seller sent another straight away, no messing.
Excellent communications. Item was well packaged and exactly as described.
Product ratings and reviews
Most relevant reviews
- 19 Apr, 2018
Satisfied
Verified purchase: YesCondition: NewSold by: *jackthehat*
- 31 Aug, 2016
A Useful Addition to the Camera Bag.
Verified purchase: YesCondition: NewSold by: *jackthehat*
More to explore:
- Canon Camera Remotes & Shutter Releases for Canon,
- Canon Camera Remotes & Shutter Releases,
- Canon Camcorder Remotes & Shutter Releases,
- Camcorder Remotes & Shutter Releases for Canon,
- Canon Remotes & Shutter Releases for Cameras,
- Canon Wireless Camera Remotes & Shutter Releases for Canon,
- Neewer Camera Remotes & Shutter Releases for Canon,
- Wireless Remotes and Shutter Releases for Canon Camera,
- Illuminated Camera Remotes & Shutter Releases for Canon,
- JJC Wireless Camera Remotes & Shutter Releases for Canon