|Listed in category:
Have one to sell?

New Mezzanine Floor Handrail, Industrial, Safety Handrail, Mezz Floor, Fittings

Mezz9com Mezzanine Floor Suppliers
  • (26)
  • Registered as a business seller
£169.20
Condition:
New
More than 10 available
Breathe easy. Returns accepted.
Postage:
May not post to United States. Read item description or contact seller for postage options. See detailsfor postage
Located in: Leicester, United Kingdom
Delivery:
Varies
Returns:
14 days return. Buyer pays for return postage. See details- for more information about returns
Payments:
     

Shop with confidence

eBay Money Back Guarantee
Get the item you ordered or your money back. Learn moreeBay Money Back Guarantee - opens new window or tab
Seller assumes all responsibility for this listing.
eBay item number:285032283105
Last updated on 28 Feb, 2024 09:25:47 GMTView all revisionsView all revisions

Item specifics

Condition
New: A brand-new, unused, unopened and undamaged item in original retail packaging (where packaging ...
Custom Bundle
No
Item Width
1500mm
Item Height
1100mm
Country/Region of Manufacture
United Kingdom
Material
Galvanised Steel, Powder Coated Standards
Colour
Grey
Brand
Unbranded
Fixings Supplied
Yes
Type
Indoor Rails
Items Included
Screws

Item description from the seller

Business seller information

Mezz9. com Limited
Rectory Road
Wanlip
Leicester
Leicestershire
LE7 4PL
United Kingdom
Show contact information
:enohP75768743870
:liamEmoc.9zzem@nehpets
Value added tax number:
  • GB 998064660
Company registration number:
  • 07354224
I provide invoices with VAT separately displayed.
Terms and conditions of the sale
In these conditions
'The Company,’ ‘Us,’ ‘We,’ ‘Our,’ means Mezz9.com Ltd
&
'The Buyer,’ ‘You,’ ‘Yourselves,’ ‘Customer,’ ‘Client,’ means the person/company purchasing the mezzanine floor or associated mezzanine floor products.
 
Acceptance - Term & Conditions of sale, Quotation & pre-manufacture drawings: By accepting our quotation via an official purchase order, email of intent, verbal, online website (www.mezz9.com) or by our quotation acceptance management system you will be fully accepting all our standard terms & conditions of sale. To hold this quotation the deposit invoice will need to be paid within 7 days after this the job will need to re-quoted due to volatile material cost.. Signatures on drawings will be taken as an approval of acceptance and fully understanding the terms & conditions / drawing proposal. Cancellation following this signature will result in a charge for the full amount of the contract value.
 
Validity: We aim to hold our quotations for as long as possible however due to the unpredictable nature of steel costs we can only guarantee our prices for a maximum of 7 days on all new mezzanine floors quotations.
If you have been quoted on a used mezzanine floor in stock, then the quotation is valid until an order or deposit has been placed. Used mezzanine floors in stock are quoted to numerous customers and therefore Mezz9.com ltd work on a first come, first served basis.
 
Cancelled Orders: Should any order placed be cancelled or not proceed for any reason, we reserve the right to charge for any site survey, drawings or calculations and associated costs where applicable up to the point of cancellation. All prices subject to a final detailed site survey. If for any reason the project, once ordered either by an official purchase order, verbal order or email of intent does not proceed to site, then we reserve the right charge for site survey, drawing and any others works carried out to date. The charge for these works is £750.00 or 10% of the contract sum whichever is the greater figure.
 
Cancelled Orders After Drawing Approval: Should any order placed be cancelled or not proceed for any reason after you the customer/buyer has signed off the drawing, we reserve the right to charge for the full amount of the contract value.
 
Force Majeure – The Company shall not be liable for any breach of the contract that arises either wholly or partly from Force Majeure, such term to include but not be limited to Act of God, Legislation, War, Fire, Breakdown of Machinery, Failure of Power Supply, Lock-Out, Strike, any other industrial dispute, or any other event or circumstance beyond the control of the Company which was not foreseeable or was unavoidable
 
Payment Terms - New mezzanine floors:
Unless agreed otherwise, our payment terms are.
25% on order – No site surveys will take place and no quote is guaranteed until this deposit is paid.
75% payment to be made on installation completion day. We will allow 7 days from invoice date for payment on final balance.
Supply Only - 75% payment to be made 2 working days prior to delivery
Full calculations of steelworks will NOT be passed on until full payment has been made.
Payment Terms - New staircases & platforms only:
Unless agreed otherwise, our payment terms are.
25% on order – No general drawings will be sent for approval until this amount is paid in full.
75% payment to be made on installation completion day. We will allow 7 days from invoice date for payment on final balance.
Supply Only – Remaining 75% payment to be made 2 working days prior to delivery
 
VAT:
Mezz9.com Ltd is a vat registered company - 998 0646 60.
All prices quoted via email, verbal or website are excluding VAT.
VAT will be added to all deposit & final balance invoices at the current prevailing UK rate.
 
Lien – Without Prejudice to any of the Company’s other rights under the agreement between the parties notwithstanding delivery and if applicable, installation of any goods or products, the goods or products shall remain in the Company until the Buyer has paid in full to the payment terms set out. If such payment is overdue in full or in part, the Company may, without prejudice to any of the Company’s other rights, recover or re-sell the goods or products and may enter the Buyers premises for that purpose.
 
Termination – The Company shall be entitled to either terminated wholly or in part the agreement of any or every other contract with the Buyer or to suspend any further contracts under the agreement in any of the following events; if any debt due to the Company is unpaid, if the Buyer becomes insolvent or being a body corporate has a receiver appointed or passes a resolution of a winding up or a court order to that effect or being an individual partnership makes any composition or arrangement with their creditors or has a receiving order made against them, and/or in addition to the right of lien which the Company shall in any events described above have a general lien over all goods of the Buyer then in the possession of the Company for unpaid price of any goods sold, delivered and installed (if applicable) by the Company to the Buyer under the agreement or any other contract.
 
Waiver – The Company’s rights and remedies shall not be prejudiced by any indulgence or forbearance to the Buyer and no waiver by the Company of any breach by the Buyer shall operate as a waiver of any subsequent breach.
 
Building Regulations / Approved Inspector Indemnity: Unless specified otherwise we have made no allowance for a building regulation application and assume that an application will be submitted by others. Please note the structure may require associated services to satisfy the current regulations. Although all our mezzanines are designed in accordance with our interpretation of the current legislation, it is not always possible to guarantee any design until a formal application is presented & passed. Building regulation fees-unless specifically quoted for, our quotation excludes any building regulation fees, or inspection fees. Under no circumstances will the non-approval for building regulations affect payment of any moneys to Mezz9.com ltd as and when it falls due. Please note that any other work required, other than the items described in the Mezz9.com Ltd quotation and the agreed drawing will be the responsibility of yourselves.
Staircases & Handrail are quoted on the current regulations and will be fully described in the quotation, if the local authority requires a change in these items following installation or approval then Mezz9.com ltd take no responsibility in any costs incurred or cost to obtain the approval.
 
Manufacture without site survey: If we are unable to conduct our own site survey and are required to manufacture off drawings by others, we do not accept any responsibility for any discrepancies. Any costs incurred due to differences between site and the drawings we have worked from will be the responsibility of others.
Drawing Approval: Following a site survey, we will produce general arrangement drawing for your approval and upon receipt will provided structural calculations which will be required for the building regulations application. It is imperative that these drawings are checked thoroughly as once approved, any alterations could delay the proposed delivery date and incur additional charges.
 
Site Survey: In most cases our quotation includes for and is subject to a full site survey following receipt of a formal order. We expect the area to be cleared prior to a survey to allow for accurate ‘manufacturing’ measurements. If the site is not cleared to allow the relevant survey it may be necessary for us to re-attend site to check a preliminary drawing. Sometimes this can attract an additional survey fee.
In the case of mezzanine floors being manufactured from supplied surveys, plans, drawings we cannot be held responsible for any alterations / additional materials required due to discrepancies from supplied information. Any associated costs will be chargeable.
 
Project management: We have allowed for 1no free site survey prior to the issue of drawings for customers approval, any further site visits required will be chargeable at a rate to be advised.
 
Lead Time: Our standard lead time is 4-5 weeks (20-25 working days) from receipt of approved drawings until delivery / commencement on site, however this is subject to workloads at the time of approval on all new & used mezzanine floors. But due to current stock issues lead times are now quoted on drawing approval.
 
Technical Standards: If the execution class has not been specified by the customer; we will consider the product to fall under the regulations of BSEN1090-1:2009+A1:2011 - Execution Class EXC2.
Products that do not fall within the scope of BSEN1090 are: handrail balustrades, pallet gates, staircases & staircase platforms, as they are considered as an nonstructural construction product and if removed, they does not affect the strength and stability of the main structure or part of the structure (see CEN/TR 17052 – Guidelines on implementing EN1090- 1:2009+A1:2011). Note: Requirements to conform to NSSS Version 6 has not been considered and no supplementary NDT has been specified by the customer.
 
CE Marking: All our new Mezzanine Floors are certified against ISO9001:2008 by the Centre for Assessment; a UKAS accredited and Law Society certification body. Furthermore, through our supply chain we are certified for the development, project management and administration of EN1090-1 for CE Marking of our products. Upon completion, we can provide an O & M Manual which will contain a Certificate of Conformity. Any NDT (non-destruction testing) requirements will be chargeable at extra costs to be agreed prior.
 
Concrete Slab Indemnity: With reference to all new & used mezzanine floors being installed into your premises. At quotation stage, it is presumed that your concrete slab / floor is made up with the following measurements - slab thickness 150mm, blinding 50mm, hardcore depth 150mm and a soil bearing pressure of 80kN/m2. If no slab information is made available for us, then mezz9.com ltd take no responsibility for the suitability & performance of the slab. Please note that any request for the baseplates to be changed will not be at the expense of mezz9.com ltd and will be the responsibility of yourselves. Any requests to produce concrete details and test results by the local authorities will be the responsibility of yourselves.
 
New Mezzanine Floor Design: Our Mezzanine floors are designed in accordance with the recommendations of BS5950 and the Bre Digest 437 which reflects the industry and are recognized standards approved by the local authorities and independent inspectors. If new mezzanine floors are supplied to European countries or worldwide then it is the responsibility of yourselves to check that the regulations, we use are correct for the country it is being installed in. Any changes following your approval will be at the expense of yourselves.
Unless specified otherwise our designs require the full height cross bracing or strut bracing for stability, in most cases this can be positioned to suit a ground floor layout however in some cases these positions are fixed.
Our quotation assumes that the specified baseplates produce an acceptable soil bearing pressure to the underside of the concrete slab. We will however require the supporting slab details during the design process if this is not available. We can complete a core sample investigation at an additional cost. If neither of the above happen then the client / customer take full responsibility for the design and any problems that could arise. Please call to discuss slab details used in the quotation if unsure.
 
Dynamic Loads: The mezzanine floor will be designed to accept static loads only. Should any machinery or equipment be placed on the floor that could impose a dynamic load then Mezz9.Com Ltd will need to be informed of this prior to placement of order. Our design makes no allowance for dynamic or high point loads, it is the client’s responsibility to advise us of any machinery or high points loads (typically from shelving / racking) which may be imposed on the structure.
 
Bracing: This quotation and the design of the mezzanine floor is based on full height lateral cross or strut bracing on a minimum of two faces of the mezzanine floor. If sufficient bracing is not permissible, then additional costs may be incurred. Although designed to the latest regulations it should be noted that mezzanine floors are not entirely rigid. Should there be any specific requirements relating to rigidity we must be informed prior to order placement. Please note Mezz9.com Ltd take no responsibility in the events following the removal of any structural bracing from the mezzanine floors.
 
Column Grid Changes: Any changes from the quoted column grid following the site survey due to obstructions or floor slab joints may result in additional costs.
 
Baseplate Designs: The thickness & design of our baseplates will be in accordance with “Eurocode 3 – Design of steel structures” and “BS5950-1 Structural use of steelwork in building”.
 
Countersunk Baseplate Fixings: Our standard base plate fixing is a hex head bolt. Countersunk fixings are available upon request and carry an additional charge. Should countersunk baseplate fixings be required we must be informed prior to placement of order.
 
Ground Slab Design: We have assumed the ground slab is of sufficient strength to take the loads imposed by the column baseplates using the codes stated above. Should we be required, for whatever reason, to design the column baseplates to “Technical report No:34 (fourth edition) Concrete Industrial Ground Floor, please be aware that the baseplate thickness can sometimes increase greatly & additional costs will be incurred. We will need to be advised of this design requirement prior to carrying our initial design process & will not accept any responsibility for any additional costs being incurred if we were not made aware of this ground slab design requirement prior to our initial design.
 
Concrete Floor Slab Levelness: Dumpy level surveys can be conducted but must be arranged and are subject to additional costs. The mezzanine floor will follow the level of the existing concrete floor slab, if there is specific requirement for the individual columns to be levelled then Mezz9.Com Ltd will need to be informed of this prior to order.
 
Concrete Floor Slab Pockets: Should column bases need to be recessed into the concrete floor slab then we will need to be informed of this at quotation stage. Pockets cut into the floor slab will be the responsibility of others and will need to be a minimum of 100mm larger than the proposed column base plate. The depth and levelness of these pockets relative to each other will need to be consistent across the floor. We do not pack from the base or grout unless previously agreed.
 
Standard Decking Sizes and delivery requirements: Mezz9.Com Ltd installs P6/U7 38mm tongue and groove industrial chipboard decking at 2400 x 600 x 38 & 2100 x 600x 38 this decking is self-Colour and is not moisture resistant. As such our secondary purlins are designed on 600mm & 700mm center. Other decking products including coverings and coatings as well as moisture resistance and various sizes are available upon request and subject to additional costs
 
Decking Surface Treatments: Where either P5, P6 or U7 particle board is supplied, please seek guidance from board manufacturer before applying any surface treatment, paint or sealant as some products can reduce the structural performance of the board and nullify any product warranty. Board failures can occur under load if incorrectly treated.
 
Offloading Confirmation For Standard Decking:
 
The driver will not be able to assist with the offloading.
 
Our lorries do not have tail lifts or offloading facilities attached.
 
Forklift Requirements For Standard Decking:
 
A forklift will be needed to off load the materials.
 
If no forklift is available a minimum of 2/3 persons will be needed to handball the goods off the lorry and this method is at your own risk Mezz9.com Ltd will take no responsibility in any injuries / accidents incurred while offloading .
We will need to know your means for offloading at time of order placement.
 
Loading gate options: If a customer request / orders a sliding or swing gate this is done so at their own decision and risk and Mezz9.com Ltd will not be held liable.
Staircases, Platforms & Handrail: Our staircases, platforms and handrail are designed in accordance with the recommendations of building control which reflects the industry and are recognized standards approved by the local authorities and independent inspectors. Mezz9.com Ltd will endeavor to supply the correct staircase, handrail & platforms for the usage. With-out building control approval prior to order or installation then Mezz9.com Ltd take no responsibility in any costs incurred or any litigation created by installing the wrong staircase or handrail. Public use staircases differ from our standard general access & utility staircases, this also applies to our standard handrail. It is the responsibility of yourselves to correctly identify the staircases or handrail needed.
Staircases, Platforms & Handrail Collection: When you the customer requests to collect your materials in person from our fabrication depo it is you the customers responsibility to ensure you have the correct transport which is large enough to load the materials onto in a safe manor. We also have to be advised when you will be arriving to collect you cannot just turn up to on the day, this enables us to ensure you product is packed correctly and ready for loading onto your vehicle. If you the customers arrives to collect your goods in unsuitable sized transport and need to return later to collect there will be a loading / holding fee of £50 charged. If you are unsure of transport size needed, please contact us in the office on 0116 2673808 and we can happily discuss what is needed with you.
 
Fire rating of mezzanine floors Indemnity: Mezz9.com ltd take no responsibility of certifying fireproofing without the undertaking of building control/approved inspector and the fire officer requirements. Any associated works following an after installation will be at the costs of yourselves. All escape routes will be exposed to fire unless stated by building control to fire protect the route, this will then be stated within the official quotation.
 
Fire Exit Distances from Staircase: Mezz9.com Ltd will endeavor to install the staircases in the correct positions and within the stated design codes for escape distances. Mezz9.com Ltd take no responsibility for any litigation via courts following an incident with-out the use of building control to confirm acceptance from design stage. Any associated works following an after installation will be at the costs of yourselves.
Galvanized /Aluminum Finishing: If we supply materials with a galvanized or aluminum finish, we cannot be held responsible for any distortion of the plate material during the hot dipping process, if you have a concern regarding this then please do not hesitate to raise with us.
 
Paint Colour & Finishes: Main Beams-wet painted to RAL 7024 or RAL 5010, (grey primer finish on floors having a suspended ceiling). Secondary Joists/Purlins-Galvanized. Columns-wet painted to RAL 7024 or RAL 5010, again grey primer finish on floors having a suspended ceiling. Staircases-wet sprayed to RAL 7024 or RAL 5010 if specified. Treads-Powder coated RAL 7024, Utility & General access with yellow nosing’s. Landings-wet sprayed to RAL 7024 or RAL 5010. Gates-wet sprayed to RAL 7024 or RAL 5010. Handrail wet sprayed RAL 7024 or RAL 5010. Handrail Tube and kick strip both aluminum.
Floors were Abutting Existing Floors: We will need to measure the existing floor height accurately (at point of survey) where it is to join the new floor. A hole will need to be drilled through the adjoining wall (by others) to allow measurement to be taken prior to manufacture. This will help with the installation to allow our operatives to pack up columns to the correct level. We will allow for packing columns adjacent to existing floors to try and match levels. Please be aware that we can only pack to +/- 2mm of existing level. Whilst every effort will be made to match levels at column points, due to joist deflection the floor cannot be guaranteed to match along its entire length. Please note we only adjust those columns adjacent to the adjoining floor, we do not adjust any existing floor columns. The remaining columns on our floor are all set to the same length and hence the mezzanine floor will follow to the levels of the ground slab. Please note that where our decking is abutting an existing floor, we cannot guarantee that the decking will be a perfect join due to cutting tolerances and existing decking cuts. Options of a thin steel joining plate are available at an extra cost.
 
Accidental Impact: Columns have not been designed for accidental impact. If forklift trucks or other heavy plant and equipment are to be used in the vicinity of the mezzanine floor after completion, then suitably designed column protection or column guards will need to be provided and installed by others.
 
Accidental Damages Or Vandalism – In the event that the Company or anyone employed by the Company causes accidental damage or vandalises the Buyer or Buyers clients property and/or premises, the Buyer must allow the Company to source a quotation or on agreement, provide a credit for the repair works. The Buyer shall not be entitled to withhold payment or set-off any amount payable under this or any other contract with the Company by reason of any claim disputed by the Company. The Buyer must allow the Company to assess the damage caused and submit a claim to the Company’s insurers if applicable.
 
Consequential Loss: Mezz9.com Ltd or its directors shall not be liable to the Buyer for any consequential loss or damage (whether for loss or profit or otherwise) costs or expenses or their claims for consequential loss whatsoever which arise out of or in connection with the supply of the goods or their use or re-sale.
 
Delivery to Site: Unless noted otherwise, the Company will deliver the product to site on a heavy goods vehicle at between the hours of 7.30am to 11am, subject to traffic conditions & other potential delays when traveling to site. The site must have a clear and level hard ground (tarmac or concrete) to access the premises and must have a wide opening (minimum 3.5m) to transfer the goods into the premises. The Buyer to Buyers client must offload the materials under their own method statement unless the Company is contracted to offload. The Buyer must provide a suitable covered storage area and if applicable, must not prevent or hinder the Company’s ability to install the product. The Company cannot be held responsible for any costs incurred due to late delivery or the Buyers failure to comply with any terms in this clause.
 
Site Access & Conditions: Our quotation assumes that the site will be clear, and level and a suitable forklift truck will be available to offload and transport materials from our delivery vehicles to the installation area. If this is not the case, we can supply one as necessary for an extra cost. Please ensure the site is clean and clear prior to installation of the floor, any variations in this agreement may cause delay and additional costs will be charged to your company at a rate advised. We will require a suitable and secure lay down area, under cover, for our materials, plant, equipment, this can be confirmed at design stage.
We assume that a 230/240v power supply will be freely available and that the site has adequate lighting in the installation area. Welfare facilities will be required and for our use free of charge, to include but not limited to the following, toilets, lighting, hand washing, drinking water, rest area, facilities for heating food/water, changing area. Temporary arrangements for the above are acceptable but we would need to be made aware of this prior to commencement on site.
 
Safety: The area of the mezzanine is to be cordoned off by others and all un authorised personnel should be prevented from entering the installation area for safety reasons.
Temporary Edge Protection: If we are not instructed to provide permanent edge protection to any exposed edge, a temporary edge protection will be required to protect other trade etc. involved in the project. Unless specified in our quotation we assume that this temporary edge protection will be provided by others. Any open edges need to be protected once we have left site for the safety of any follow-on trades. Any edge protection needs to be hired will incur an additional cost agreed at quotation stage. If netting for installation is required, this will need to be known at quotation stage or except the costs given if instructed to provide this mid installation.
Delivery / Collection / Shipping Policy
1. All items are collection only unless otherwise stated, some items are delivery only straight from our suppliers.
** PLEASE NOTE: Deliveries can only be made to a hardstanding area with suitable forklift offloading facilities being available **
Failed deliveries unable to off-load will incur a delivery charge of the quoted amount + vat. A return delivery cost will be based on original quotation and paid for before the goods are re-loaded.
2. The customer shall collect the goods from the supplier's premises, or where specified in the order, the supplier shall deliver the goods or shall procure the delivery of the goods by a third party, the location set out in the order or such other location as the partied may agree. Where goods are to be delivered, the customer shall provide the supplier or such third parties with access to the delivery location in order that the delivery of the goods may be carried out. The customer must notify the supplier promptly of any days or part days when such access to the delivery location will be unavailable.
3. Where goods are delivered, delivery of the goods shall be completed on the goods arrival unloaded at the delivery location. The customer shall be responsible for all unloading of the goods from the delivery vehicle at the delivery location and the customer shall indemnify the supplier against all liability arising from or related to such unloading:
4. Offloading and forklifts requirements for standard decking boards:
Due to COVID-19 restrictions the driver will not be able to assist with the offloading of any materials until further notice. Our lorries do not have tail lifts or any offloading facilities with them.
A forklift will be needed to offload the materials upon delivery. If no forklift is available, then a minimum of 2/3 persons will be needed to handball the goods off the lorry and this method is taken at you the customers own risk Mezz9.com Ltd will take no responsibility in any injuries / accidents caused by this method.
5. Any dates quoted for delivery are approximate only, and the time of the delivery is not of the essence. The supplier shall not be liable for any delay in delivery of the goods that is caused by force majeure event or unavailability of the access to the delivery location or the customer failure to provide the supplier with adequate delivery instructions or any other instructions that are relevant to the supply of the goods.
6. If the supplier fails to deliver the goods, it's liability shall be limited to the cost and expenses incurred by the customer in obtaining replacement goods or similar description and quality in the cheapest market available, less the price of the goods. The supplier shall have no liability for any failure to deliver the goods to the extent that such a failure is caused by a force majeure event or the unavailability of access to the delivery location or the customers failure to provide the supplier with adequate delivery instructions or any other instructions that are relevant to the supply of the goods.
7. If seven ( 7 ) business days after the day on which the goods should have been collected or the supplier first attempted to effect delivery the customer has not accepted the delivery of them, item, the supplier may recall or otherwise dispose of part or all of the goods and , after deducting reasonable storage and selling costs, account to the customer for any excess over the price of the goods or charge the customer for any shortfall below the price of the goods.
8. Any discrepancy between the quality of the goods ordered and the quantity of the goods delivered must be notified in writing to the supplier within three (3) business days of delivery.
9. The supplier may deliver or procure delivery of all the goods by instalments, which shall be invoiced and paid for separately. Each instalment shall constitute a separate contract. Any delay in delivery or defect in a instalment shall not entitle the customer to cancel any other instalment.
10. Immediately on delivery of the goods the customer shall: inspect all goods and inform the supplier of any shortage or any defect apparent on normal visual inspection. The customer shall check, complete, and send to the supplier immediately following of delivery, the delivery documents to confirm that all goods are delivered and defect free or otherwise.
11. Completion of the delivery documents by the customer or by the customers representatives confirms the customers agreement that the customer has been given a reasonable opportunity to inspect the goods and that the goods have been inspected.
I certify that all my selling activities will comply with all EU laws and regulations.
Mezz9com Mezzanine Floor Suppliers

Mezz9com Mezzanine Floor Suppliers

100% positive Feedback
181 items sold
Joined Nov 2012
Usually responds within 24 hours

Seller Feedback (21)

t***o (1871)- Feedback left by buyer.
Past 6 months
Verified purchase
Great item, fast delivery! Highly recommended eBayer A+++++
i***f (657)- Feedback left by buyer.
Past 6 months
Verified purchase
Great ebay seller A1+++++++++++++
d***1 (1005)- Feedback left by buyer.
Past 6 months
Verified purchase
Really excellent product
This is a private listing and your identity will not be disclosed to anyone except the seller.